Error message

  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in block_page_build() (line 271 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/modules/block/block.module).
  • Warning: Cannot use a scalar value as an array in metatag_page_build() (line 1949 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/sites/aceacsr18/modules/contrib/metatag/metatag.module).
  • Warning: Cannot use a scalar value as an array in metatag_page_build() (line 1952 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/sites/aceacsr18/modules/contrib/metatag/metatag.module).
  • Warning: Cannot use a scalar value as an array in metatag_page_build() (line 1984 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/sites/aceacsr18/modules/contrib/metatag/metatag.module).
  • Warning: Cannot use a scalar value as an array in metatag_page_build() (line 2009 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/sites/aceacsr18/modules/contrib/metatag/metatag.module).
  • Warning: Cannot use a scalar value as an array in ctools_page_alter() (line 814 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/sites/aceacsr18/modules/contrib/ctools/ctools.module).
  • Warning: Invalid argument supplied for foreach() in element_children() (line 6608 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/includes/common.inc).
  • Warning: Cannot use a scalar value as an array in drupal_render() (line 6065 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/includes/common.inc).
  • Warning: Cannot use a scalar value as an array in drupal_render() (line 6120 of /var/www/installazioni_bilanci/acea/aceacsr18-drupal-7.64-2019-03-12T12.54/includes/common.inc).

The 2018-2022 Sustainability Plan and operational objectives

The 2018-2022 Sustainability Plan, as already noted, acts on governance and operational levels, identifying 6 cross-cutting objectives aimed at incorporating sustainability into the governance of the company and 5 macro Group operational objectives

sustainability plan

The 5 macro objectives are broken down into 14 frameworks for action, 26 operational objectives and 137 targets for 2022 and related KPIs which allow the progressive achievement thereof to be monitored. It is envisaged that the Plan will be updated periodically, especially at an operational level, so that consistency with changes to the management and strategic industrial guidelines of the Group is ensured.

Below is a summary image of the Plan and a detailed breakdown of the operating level, with the 2018 actions and related KPIs.

sustainability plan

DETAILED OBJECTIVES OF THE 2018-2022 SUSTAINABILITY PLAN AND THE ACTIONS TAKEN DURING THE YEAR