Energy distribution
The distribution network
Areti manages the electricity distribution network at Rome and Formello, extending over about 31,000 km and capable of supplying a basin of about 2.8 million resident inhabitants. In terms of volumes of electricity distributed, about 9,800 GWh/year, Acea is the third largest Italian operator in the sector.
In Table no. 50 the principal plant data is described with reference to the primary and secondary substations and to the overhead and underground distribution lines.
The environmental indicator correlated to the protection of the land and calculated as a percentage share of the underground high voltage (HV) network in relation to the total of the high voltage lines in use (overhead and underground) has improved even more. In fact, the data monitored by year in 2018 were again equal to 46% (44% in 2017); also due to the transformation and modernisation of the high and very high voltage electricity distribution networks.
TABLE NO. 50 - ENVIRONMENTAL INDICATORS: NUMBER OF OVERHEAD AND UNDERGROUND DISTRIBUTION LINES AND PLANTS (2016-2018)
Areti | ||||
systems and output | u. m. | 2016 | 2017 | 2018 |
High Voltage/High Voltage - High Voltage/ Medium Voltage primary sub-stations | no. | 71 | 71 | 70 |
High Voltage/High Voltage and High Voltage/Medium Voltage transformers | no. | 170 | 169 | 166 |
transformation power | MVA | 7,924 | 7,921 | 7,631 |
sub-stations in use | no. | 13,152 | 13,159 | 13,211 |
Medium Voltage/Medium Voltage - Medium Voltage/Low Voltage transformers | no. | 12,831 | 12,832 | 12,838 |
transformation power | MVA | 6,183 | 6,203 | 6,236 |
overhead and underground networks | ||||
high voltage network - overhead lines | km | 321 | 310 | 282 |
high voltage network - underground lines | km | 243 | 243 | 243 |
medium voltage network - overhead lines | km | 429 | 419 | 424 |
medium voltage network - underground lines | km | 10,180 | 10,137 | 10,166 |
low voltage network - overhead lines | km | 1,646 | 1,641 | 1,641 |
low voltage network - underground lines | km | 17,917 | 18,147 | 18,306 |
With reference to the electric and magnetic fields, in particular relative to the primary transformer substations, High and Medium Voltage overhead electricity lines and secondary transformer cabins, the possible risks for the health of employees and the community of reference are dealt with, respectively, in the Risks Evaluation Document and in the Corporate Environmental Analyses Document. Areti conducts periodic sample checks in the company’s sites, carried out also following reports by users/customers or External Bodies. Additional checks are conducted by ARPA Lazio 109 following specific requests by the public and customers.
MEMORANDUM OF UNDERSTANDING FOR THE REARRANGEMENT OF THE ELECTRICITY NETWORK
2018 saw the continuation of the plan to modernise the high voltage electricity distribution network (150 kV), defined in the Memorandum of Understanding signed in 2010 among Areti SpA (formerly Acea Distribuzione), the Municipality of Rome and Terna SpA, which concerned, in particular:
- the completion of the demolition of the 150 kV Rome North-Cassia overhead line, for a total of 9.8 km and 39 supports, consequent upon the activation of the Flaminia-Cassia high voltage line;
- the completion of construction works for the 150 kV “Rome North-San Basilio” line, relative to the stretch to be adjusted for a length of 5.5 km with green coloured pylons and tubular supports, consistently with the requirements of the Rome Nature Body;
- the commencement of construction works for the 150 kV “Rome North-San Basilio” line, relative to the new section from the Rome North Electrical Station for a length of 4 km with green coloured pylons and tubular supports, consistently with the requirements of the Rome Nature Body;
- the start of the demolition of the 150 kV Flaminia 2 - East Sorting 2 line, for a length of 22.6 km and 74 supports.
Upon completion of the Plan, thanks to the lower energy losses, in addition to improving the service and the related social benefits, there will also be a significant environmental benefit thanks to the significant energy savings expected, amounting to about 58 million kilowatt hours, equivalent to the annual consumption of about 20,000 households.
The management of the electricity distribution network of Rome and Formello is characterised by the continuous improvement of the performances, with particular attention to energy efficiency.
Therefore, initiatives to reduce grid losses continued also in 2018, ranging from the progressive and ongoing replacement of medium voltage levels from 8.4 kV to 20 kV, to the installation of MV/LV transformers with very low losses (see also the chapter on Customers, paragraph Quality delivered).
The activities performed for the smart city that continue to improve the performance of the networks thanks to the evolution and integration of management systems and, in general, the applications of technological innovation in the management of the network, are illustrated in the chapters Customers and Institutions and the company.
Also as a result of the activities mentioned above, energy losses on the grid during the year amounted to approximately 7.2% of the total transported, a slight increase compared to the previous two years.
[109] According to the following legislative references: Legislative Decree no. 81/08; Italian Electro-technical Committee Guide 211-6 first ed. of 01/2001; Prime Ministerial Decree 8/7/2003 “Fixing of the limits of exposure, the values of attention and the quality objectives for the protection of the population from electric and magnetic fields at the network frequency (50Hz) generated by the power lines”.